How a ventilated rainscreen facade works

The cladding you see is only the outer skin. The air cavity behind it is what keeps the wall dry and the insulation working.

A ventilated rainscreen facade separates two jobs that a traditional wall tries to do with one layer. The outer panels deal with weather and appearance. The wall behind them deals with structure, airtightness and insulation. Between the two sits a continuous air cavity.

The layers, from inside to outside

  • Structural wall: concrete, masonry or a framed wall that carries the loads.
  • Brackets: fixed to the wall with anchors, usually with a thermal pad behind them to reduce heat loss through the metal.
  • Insulation: fitted against the wall, between and around the brackets.
  • Air cavity: an open gap between the insulation and the back of the cladding.
  • Substructure: vertical or horizontal profiles carried by the brackets.
  • Cladding: ceramic, terracotta, fiber cement, HPL, stone or another panel, held by clips, rails, rivets or adhesive.

Why the cavity matters

Most rain is stopped by the outer panels. The small amount that passes the joints runs down the back of the cladding and drains out at the bottom. Air enters at the base of the cavity and leaves at the top, so any moisture in the cavity or coming out of the wall is carried away. The insulation stays dry, and dry insulation keeps its performance.

In summer the same air movement removes part of the heat absorbed by the cladding before it reaches the wall.

What to decide early

  • Cavity and insulation depth: together they set the bracket length, which affects cost.
  • Substructure spacing: depends on panel size, panel weight and local wind load.
  • Fixing method: concealed or visible. It changes both the look and the price.
  • Openings and edges: window reveals, corners, the base and the parapet need their own details and must keep the cavity ventilated.

Structural design, wind load calculation and fire requirements depend on the building and on local regulations. They should be confirmed by the project engineer before the system is ordered.

Related systems

This article is general guidance. Project requirements, local building regulations and the specification confirmed with your order always take priority.