Generalimex Trading Limited — Your System Solutions Partner

Buying Guide

Reading an FOB price: what is included and what you add

Prices on this site are FOB Nansha, China. What that means, where our responsibility ends, and which costs to add when you compare with a local quotation.

Every system on this site is priced in US dollars per unit, FOB Nansha. FOB, "free on board", is one of the Incoterms rules published by the International Chamber of Commerce. It defines which costs and risks belong to the seller and which to the buyer.

What the FOB price covers

  • the goods themselves, packed for export;
  • inland transport to the port of loading;
  • export customs clearance in China;
  • loading the goods on board the vessel named by the buyer.

Once the goods are on board at Nansha, the risk passes to the buyer.

What the buyer adds

  • Ocean freight from Nansha to your port, booked by you or your freight forwarder.
  • Cargo insurance for the sea voyage.
  • Destination charges: terminal handling, documentation and port fees.
  • Import duties and taxes in your country, which depend on the customs classification of the goods.
  • Inland delivery from the port to your warehouse or site.
  • Installation and any local design or approval costs.

Comparing with a local price

A local supplier's price normally includes all of the items above. To compare fairly, add them to the FOB price to reach a landed cost per square metre. Freight is charged per container, so divide the container cost by the quantity that fits in it. Your freight forwarder can quote freight and destination charges and tell you the duty rate for your country.

Practical points

  • Freight rates move, so ask for a current quotation close to the shipment date.
  • Check before ordering whether your country requires certificates, test reports or labelling for building products.
  • For delivery terms other than FOB Nansha, contact us before ordering.

The terms that apply to an order are those in our proforma invoice and Terms and Conditions.

Related systems

This article is general guidance. Project requirements, local building regulations and the specification confirmed with your order always take priority.

More articles